Owners seeking better resource efficiency need to understand which building decisions influence the outcome. EDGE is one of the green building certification systems available for this purpose. It addresses energy, water and materials through a common calculation framework. Suitability should be assessed through the scope and verifiable measures, alongside the building's use.

What does EDGE assess?

EDGE was developed by IFC, a member of the World Bank Group. It compares energy, water and materials indicators with defined reference conditions. The categories are assessed separately; a strong result in one does not automatically compensate for a shortfall in another. EDGE — Certification.

This approach helps connect objectives to specific project decisions. Glazing, shading, environmental systems, water-using equipment and building components address different needs within the same building. Selection should consider use, maintenance and practicality alongside initial cost. Certification calculations inform these choices rather than replace architectural and engineering judgement.

Assess suitability at the start

EDGE provides assessment routes for different building uses and project stages. The team should first establish the application boundary and how use will be represented. Mixed-use buildings need particular attention to the relationship between the boundary and different uses. Preparation may also differ between new and existing buildings. EDGE — Application process.

Architectural plans, an outline of building systems and the current project stage are useful starting information. Products that have not yet been selected should not appear as confirmed decisions. As design develops, updated information and a clear connection between decisions and calculations keep the assessment understandable. This helps information from different teams work together.

Design intentions and completed work

New projects may pursue preliminary certification during design and final assessment after construction. A preliminary certificate does not mean that the building is complete or has achieved final certification. Existing buildings can also proceed directly to final certification. EDGE — Certification stages.

The distinction explains why product selections and site evidence matter. Intended design properties should align with purchased and installed solutions. When a product changes, both the calculation and supporting evidence should be reviewed. Identifying who will provide each document and when it will be checked helps reduce gaps later.

Consultancy and auditing have different roles

An EDGE Expert helps the team understand the system and prepare its application. An EDGE Auditor examines objective evidence through the auditing process. The individual auditor must not also act as consultant on the same project, and the appointment must satisfy the applicable independence rules. Certification is decided through the authorized certification process. GBCI — EDGE Experts and Auditors.

When comparing proposals, these responsibilities should remain clear. Owners should understand how consultancy, calculation preparation, independent auditing and certification body fees are addressed. The team can then identify which party handles each part of the work.

Match the target to the project's needs

EDGE offers different certification targets. A more advanced target should be considered alongside operational conditions and the required verification, as well as design calculations. Its relevance depends on feasible measures and the operator's ability to maintain them. The target's name alone does not explain the preparation required.

Some design questions may justify additional analysis. A detailed comparison of mechanical systems or façade options, for example, may be scoped as a separate energy modelling study. Defining the question first helps select an appropriate method without commissioning unnecessary analysis.

Starting with AECO

AECO's EDGE consultancy considers the project boundary, calculation inputs and evidence responsibilities together. The aim is to turn efficiency targets into traceable project decisions. Sharing the building's use and current stage helps establish an appropriate preparation route. Any need for energy modelling can be identified within that review.

Sources

For your questions

Frequently asked questions

Is EDGE only suitable for new buildings?

Existing buildings also have an assessment route. Their completion status and available records help determine the appropriate application preparation.

Are energy, water and materials results added together?

Each category is assessed separately. An improvement in one does not automatically satisfy the requirement for another.

Does preliminary certification replace final certification?

No. Design-based preliminary assessment and final assessment of completed work are separate stages. Project communications should preserve this distinction.

Can our consultant also audit the project?

The same individual cannot act as both consultant and auditor on that project. Appointment and independence requirements should be clarified with the authorized certification body.

What information is useful for an initial review?

Building use, project stage, plans and basic system information support the initial review. Detailed evidence needs follow once the scope and target are established.